Nine points that should be paid attention to when building a ceiling dehumidifier

Time:2021/10/18 14:08:40

The ceiling dehumidifier is the same as other types of dehumidifiers. They are used for dehumidification, but the location and installation method are slightly different. For example, the industrial dehumidifier is installed on the ground or other places, and the ceiling dehumidifier is suspended from the ceiling, which can save a certain amount of space, and is more suitable for ceiling dehumidifiers in areas with limited space. So what points should be paid attention to when building a ceiling dehumidifier? Next, let the editor of the ceiling dehumidifier explain it, I hope it can be helpful to everyone.

ceiling dehumidifier

1. The ceiling dehumidifier should be placed on a clay boss with a height of 50-100 mm, one meter away from the wall. The raised plane is smooth and horizontal, and each functional section is connected with bolts, and the sections are sealed with polyethylene, and there is no leakage between the foams.

2. Please take out the manual before installation, and then check all accessories to ensure that all accessories are not damaged, and then check whether the air valve fan can rotate normally.

3. Drainage ditch should be fixed around the cooling section to drain the condensed water, and the condensate outlet should be equipped with a water seal elbow, and the height of the water seal is 50-100mm.

4. During installation, the main circuit is glued to the sealing cover to prevent air leakage.

5. The water inlet of the outdoor unit must be equipped with a valve, which is closed and adjusted to maintain the flow of cold water.

6. The air conditioner cannot bear the weight of the pipe connected to the ceiling dehumidifier.

7. When installing the insulation board, check whether the rotation direction of the fan impeller is correct.

8. After the ceiling dehumidifier is installed, it should be tested. Do not start when the valve is fully open to avoid excessive starting current and motor failure. Work for 8 hours without abnormal phenomenon is qualified.

9. The air conditioner on the ceiling must be well grounded.

The above hotel-style ceiling dehumidifier should pay attention to all the contents of the nine points when building, thank you for your understanding and support!